Once again on the Planning Board agenda... Tonight.
Below is how the Heathcote Tavern looked Monday, June 26th. The cupola that has been missing since superstorm Sandy, has not been repaired. I called the listing agent for the building many times and got reassurances... But they never did anything. They know how much we all miss the cupola and how it completes the tower... But, no. They have not done a thing to please the residents.
Instead their requests do not seem to stop.
Now, they no longer wish to bury the power lines to the building. Well, that is not acceptable. Their artistic sensitivity leaves much too be desired.
I think their request in front of the Planning Board should be denied. Instead they should be required to repair and put the cupola in place by end of July 31, 2017. Plus the power lines should be buried, no matter what the cost.
Below is how the Heathcote Tavern looked Monday, June 26th. The cupola that has been missing since superstorm Sandy, has not been repaired. I called the listing agent for the building many times and got reassurances... But they never did anything. They know how much we all miss the cupola and how it completes the tower... But, no. They have not done a thing to please the residents.
Instead their requests do not seem to stop.
Now, they no longer wish to bury the power lines to the building. Well, that is not acceptable. Their artistic sensitivity leaves much too be desired.
I think their request in front of the Planning Board should be denied. Instead they should be required to repair and put the cupola in place by end of July 31, 2017. Plus the power lines should be buried, no matter what the cost.